Named robots, docks, FMS, safety zones and agreed WMS/WCS interfaces.
Define the robot and dock boundary, service clock, access conditions, spare strategy and return-to-service evidence before availability becomes a contractual metric.
Review the Boundary
System availability for the fleet is calculated only after the measured boundary is named. The record identifies included robots, docks, orchestration software, the observation window and whether planned maintenance, lack of upstream work, downstream blockage, utilities or operator delay are excluded. Mean time to repair is tracked separately from the notification clock.
Subsystem and end-to-end values may differ. Robots can be available while WMS releases no work; conversely, the fleet manager can assign missions while a safety zone remains locked out.
Named robots, docks, FMS, safety zones and agreed WMS/WCS interfaces.
Shift calendar, planned stops and the timestamp source used across equipment logs.
WMS decision, WCS orchestration, FMS traffic, PLC safety or facility utility.
Safe reset, test mission, load disposition and event closure accepted by the site team.
A robot stops for an obstacle or localization fault. The plan states who clears the path, how missions are canceled or reassigned, where the robot is pulled out and which test mission proves the zone is ready again.
Dock saturation delays release into the peak window. Recovery requires dock priority rules, temporary capacity limits and a clear distinction between energy management and a robot hardware fault.
Task handshakes stall. Ownership identifies whether the WMS, WCS, FMS or network layer owns the timeout, which fallback work mode remains available and how inventory or order state is reconciled after restart.
A critical-spares matrix links each item to installed quantity, failure effect, diagnostic confidence, lead time, shelf-life or storage condition, replacement competence and commissioning step. It distinguishes consumables from parts that can remove a meaningful fraction of fleet capacity.
| Class | Typical basis | Readiness evidence |
|---|---|---|
| Site stock | High consequence or long replenishment lead time | Labeled location, preservation check and compatible revision |
| Regional stock | Shared component with predictable transport route | Dispatch owner, cutoff time and customs boundary |
| Repairable assembly | Specialist rebuild and controlled exchange | Return authorization, test method and configuration record |
Availability discussions reuse the same SKU mix and peak window used for throughput validation.
Align rate evidence →Factory packages include diagnostic access, spare fitment and configuration records for critical assemblies.
Request FAT outline →Site acceptance includes blocked-aisle, charging contention and interface timeout rehearsals.
Plan SAT drills →Notification, diagnosis, parts access and return-to-service each keep a named owner and timestamp.
Discuss coverage →